Luxury vinyl plank (LVP) in Forney, TX
LVP took over family houses for a straightforward reason: it absorbs what kids, dogs and a Texas backyard hand it, and a tipped water bowl means nothing to it. The catch is that a rigid plank performs only as well as the slab underneath it, because no core sold today bridges a wavy floor. Choosing between a stone core and a foamed core is the other half of the decision, and it turns on the room. Installed by our own crew across Forney.
Luxury vinyl plank (LVP) in Forney, done right.
Homeowners across Forney, TX call All About Floors for luxury vinyl plank (lvp) because every job runs with our own crew, no subcontractors, no surprise charges, and one number to call from first sample to finished floor.
We install luxury vinyl plank (lvp) across Forney and the surrounding area, including Heartland, Heath, Sunnyvale, Talty.
What's included
- SPC and WPC cores specified room by room
- Wear layers from residential through commercial grade
- Slab ground and patched to flatness tolerance before install
- Expansion gaps held at jambs, hearths and toe kicks
- Glue-down installation for long open runs and small wet rooms
- Continuous runs from hallway into bath and laundry
- Silicone-sealed perimeters and toilet flanges
- Single planks replaced without redoing the floor
Built for Forney homes.
Our showroom is at 10 Mustang Court, so Forney isn't a service area for us, it's the town we work in every day. Between April 2020 and July 2024 the Census Bureau had Forney as the fastest-growing city in the country, up 64.2% to 38,572 people, and most of that arrived as fresh slab in Devonshire, Gateway Parks and Travis Ranch. We also floor the older frame houses near the downtown antique shops. Call (972) 564-5533 and we'll bring samples to the house.
Forney is our home base, and the town splits cleanly into two different flooring problems. North and south of US 80 you have master-planned ground, Devonshire off FM 548, Gateway Parks between US 80 and I-20, Travis Ranch, Windmill Farms, Clements Ranch, nearly all of it slab-on-grade and nearly all of it built since 2000. The permit record shows the pace: 1,082 single-family permits in 2021, 663 in 2024, 273 in 2025. Those houses arrive with builder-grade carpet and thin sheet vinyl that most owners are finished with inside five or six years.
On a young slab, two things decide the job: moisture and flatness. A slab poured and framed over quickly can still be releasing moisture a couple of years later, so we test before any glue-down or engineered wood goes near it. Flatness matters more than people expect in the open-concept plans these builders favor, where one continuous run of plank crosses the entry, kitchen and living room with nothing to break it up. High spots get ground and low spots get filled before the first board is laid.
Older Forney is a different animal. Around the downtown antique shops, Bell Park at Trinity and Bois d'Arc, and the original Founders Addition, you find pre-war frame houses sitting on pier-and-beam with plank subfloors. Those need the subfloor stiffened and levelled first, and they almost always need casings undercut, because the finished floor height changes.
Underneath all of it is Blackland Prairie clay. Houston Black, the state soil, is a Vertisol: it swells when wet and shrinks when dry, and the series description records seasonal movement of several centimeters. That is the practical argument for floating a click-lock plank instead of gluing it down in a house that already shows movement, and for putting a crack-isolation membrane under any tile we set.
Luxury vinyl plank (LVP) jobs near Forney
What homeowners say
"All About Floors did an amazing job on our vinyl wood floors. It was all done within a day and all looked perfect when they were finished. Would highly recommend using them!"
Nicole Roberts · via Google "All About Floors is amazing to work with! We recently had our entire flooring replaced and they not only did a wonderful job, the support and aftercare has been top notch! Highly recommend"
J Shoe2 · via Google
Luxury vinyl plank (LVP) in Forney, questions
Our Devonshire house is only four years old. Why does the flooring already look worn?
Because builder allowances in the Forney master-planned communities usually cover entry-level carpet and a thin sheet vinyl in the wet areas. Neither is built for a decade of traffic. The slab underneath is usually fine, which is good news: once we grind the high spots and fill the low ones, a wear-layer LVP or engineered wood goes down over the same subfloor and lasts far longer.
We're in an older Forney house near the antique shops, on pier-and-beam. Can you do the same floors?
Yes, but the prep is different. Pier-and-beam houses off the downtown streets typically have plank subfloors that have moved over decades. We stiffen and level the deck first, add underlayment where it's needed, then install. Expect the finished floor to sit slightly higher than the old one, which means door casings get undercut and interior doors may need trimming.
Do we have to come to the Mustang Court showroom to pick materials?
You're welcome to, the showroom is at 10 Mustang Court and it's a short drive from anywhere in Forney. But most people would rather see samples in their own light, next to their own cabinets and walls. Estimates are free and we bring samples to the house. Once you've decided, we can usually start within about two days.
If it is waterproof, can we put it anywhere water goes?
The plank is waterproof; the installation is water resistant. Spills, mopping, a dog that drinks messily and a bathroom floor are all fine indefinitely. A supply line that floods overnight is a different event, because water runs through the perimeter gap and sits on the slab under a floating floor, and it has to be brought up to dry. Vinyl survives that better than wood does.
Can we run it into the bathroom and laundry?
Yes, and it is the most common request we get. We keep the run continuous from the hallway so there is no threshold to trip over, hold the expansion gap behind the baseboard, seal the perimeter and the toilet flange with silicone, and cut clean around the washer feet. In a small room a glue-down plank is often better, since a floating field needs area to behave.
Will it fade next to our west-facing windows?
It can over a period of years, and it is the complaint we hear most about vinyl in this part of Texas. The print sits under a clear layer, and hard afternoon sun lightens it, most visibly where a rug shaded part of the floor and then gets moved. Solar screens, low-E glass or a shade during the worst hours slow it down.
Flexible financing available
Wisetack and Synchrony
Every floor type we install in Forney, TX
-
ForneyHardwood installation in Forney
Solid and engineered hardwood installed over slab and pier-and-beam homes in Forney, Kaufman and Rockwall counties and the wider Dallas metro.
Learn more → -
ForneyHardwood refinishing & sanding in Forney
Sanding and refinishing existing hardwood floors across Forney, Kaufman and Rockwall counties, starting with an honest read on whether yours can be saved.
Learn more → -
ForneyLaminate in Forney
Laminate flooring installed across Forney, Kaufman and Rockwall counties, with straight answers on AC ratings and the rooms it does not belong in.
Learn more → -
ForneyTile in Forney
Porcelain, ceramic and natural stone tile set over properly prepped slabs in Forney and across the Dallas metro. Free in-home samples.
Learn more → -
ForneyCarpet in Forney
Carpet and pad for bedrooms, stairs and upstairs living areas, measured, seamed and power stretched throughout Forney and Kaufman County.
Learn more → -
ForneyFloor removal & demo in Forney
Tile, thinset, carpet and old vinyl removed and hauled off, and the slab ground flat, for homes across Forney, Kaufman and Rockwall counties.
Learn more →
Luxury vinyl plank (LVP) in nearby areas
Ready to start your Forney project?
Free in-home estimate, clear pricing, and a crew that shows up when we say we will.

